Skip to main content
← All tools

Architect glazing schedule

Create a multi-panel draft schedule with full construction, fabrication and evidence requirements. The current panel draft is shared with the other tools.

Schedule panels

Up to 200 panels, shared with the weight schedule. Use unique tags; duplicate tags block export. The schedule stays in this browser session.

    Prepare next panel

    Examples and guidanceApplication

    For example window, balustrade or floor; structural applications need specialist review.

    What your choice means

    For example window, balustrade or floor; structural applications need specialist review.

    Examples and guidanceOrientation

    Ordered layers start at the outside or stated reference face.

    What your choice means

    Ordered layers start at the outside or stated reference face.

    Proposed construction — outside/reference face first
    Examples and guidanceNamed performance reference

    A reference replaces the construction. Historical published data is shown only for an unchanged supported build; confirm current supply and product evidence.

    What your choice means

    A reference replaces the construction. Historical published data is shown only for an unchanged supported build; confirm current supply and product evidence.

    Layer 1: glass

    Nominal overall thickness: 6mm (includes cavities). 6mm clear toughened

    This adds nominal layer thicknesses; it does not establish safety class, structural capacity or manufacturing tolerances. Annealed, heat-strengthened and toughened laminates need the appropriate specified product/system.

    Examples and guidanceHoles

    Positions not entered in the drawing remain TBC. Processing is completed before toughening.

    What your choice means

    Positions not entered in the drawing remain TBC. Processing is completed before toughening.

    Examples and guidanceUg target (W/m²K)

    Requirement to confirm, not a declared product value.

    What your choice means

    Requirement to confirm, not a declared product value.

    Examples and guidanceAcoustic target / noise context

    Requirement to confirm, not a declared product value.

    What your choice means

    Requirement to confirm, not a declared product value.

    Examples and guidanceSolar/daylight target

    Requirement to confirm, not a declared product value.

    What your choice means

    Requirement to confirm, not a declared product value.

    Examples and guidanceFire requirement and test regime

    Requirement to confirm, not a declared product value.

    What your choice means

    Requirement to confirm, not a declared product value.

    Examples and guidanceRequired standards / evidence

    Requirement to confirm, not a declared product value.

    What your choice means

    Requirement to confirm, not a declared product value.

    Examples and guidanceHardware / supporting interfaces

    Requirement to confirm, not a declared product value.

    What your choice means

    Requirement to confirm, not a declared product value.

    Examples and guidanceTolerance / installation requirements

    Requirement to confirm, not a declared product value.

    What your choice means

    Requirement to confirm, not a declared product value.

    Complete schedule preview

    Draft

    Each panel retains tag/location/application, dimensions/reference face, every layer, product documentation, treatment/finish, edges, holes/cutouts/tolerances, hardware/interfaces and quantity. Performance targets remain requirements, not declared values.

    DRAFT GLASS SCHEDULE — supplier and project specialist confirmation required
    
    
    Sources and scope

    Draft stays in this browser session. Copy/export before closing it. This is an enquiry draft, not manufacturing or structural approval.

    Continue in your business workspace

    Keep drawings, layers, specialist notes, measurements, access surveys and all 0 schedule panels together for a quote or installation plan. Subscription access is checked when saving.